Fifty-four reinforced-concrete pile heads were demolished about 10m below water level and lifted out in sections.
Methods:Wire saw cutting and hydraulic splitting

About 4,000m³ of walls and slabs were demolished with multiple robots in a confined site.
Methods:Brokk 330/400 remote robots and hydraulic breaking

Concrete structures at the main building and vehicle lanes were demolished, involving about 1,900m³.
Methods:Wire saw cutting and remote robot

Uneven bridge piles were cut to a consistent level while minimizing impact on the structure.
Methods:Blade saw cutting

Large concrete plinths up to about 7m thick were dismantled in sections weighing roughly 20 to 30 tons.
Methods:Blade saw and wire saw cutting

The four-storey concert hall, built in 1930, was relocated about 66.4m using low-vibration, low-noise cutting.
Methods:Wire saw cutting

The 410.44m bridge demolition and reconstruction was carried out in two phases.
Methods:Wire saw cutting

A large tunnel retaining wall was demolished with remote equipment in a confined work area.
Methods:Brokk 400 remote robot and hydraulic breaker

The observation deck was divided into sections of different sizes for lifting and removal.
Methods:Wire saw cutting

The slab was divided into sections using a three-phase blade saw cutting machine.
Methods:Blade saw cutting