Back to project cases
Project case 2013

Xicheng Canal Bridge, Shanghai

The 410.44m bridge demolition and reconstruction was carried out in two phases.

Xicheng Canal Bridge, Shanghai
Case summary

The 410.44m bridge demolition and reconstruction was carried out in two phases.