Back to project cases
Project case
2013
Wan Chai Ferry Pier
Fifty-four reinforced-concrete pile heads were demolished about 10m below water level and lifted out in sections.
Case summary
Fifty-four reinforced-concrete pile heads were demolished about 10m below water level and lifted out in sections.